Tratamientos Especiales en la Línea 3 del tren ligero en Guadalajara para la protección de construcciones aledañas durante el paso de la tuneladora

PARADA MOLINA, JOEL (2018) Tratamientos Especiales en la Línea 3 del tren ligero en Guadalajara para la protección de construcciones aledañas durante el paso de la tuneladora. Maestría thesis, Universidad Autónoma de Chihuahua.

[img]
Vista Previa
Text
ESTUDIO DE CASO JOEL PARADA MOLINA.pdf

Download (142Mb) | Vista Previa

Resumen

Line 3 of the light rail has its origin in the municipality of Zapopán, the first station is called Periférico - Zapopán and its termination at the Tlaquepaque central bus station, has a length of 20.43 km, which is distributed as follows. Viaduct 1 starts from Zapopán station to the normal station with a length of 8.35 km, the second tunnel section, starts from the normal station to the Plaza de la Bandera station with a length of 5.33 km and finally the section of Viaduct 2, starts at Plaza de la Bandera station and ends at the central bus station with a length of 6.75 km It has 18 stations, 13 of them are elevated (viaduct) and 5 underground (tunnel), each station has a useful platform length of 75m

Tipo de Documento: Tesis (Maestría)
Clasificación temática: T Technology > TF Railroad engineering and operation
Usuario Remitente: Admin Administrador del Respositorio
Depositado: 13 Ago 2020 17:01
Ultima Modificación: 13 Ago 2020 17:01
URI: http://repositorio.uach.mx/id/eprint/297

Actions (login required)

Ver Objeto Ver Objeto

Universidad Autonoma de Chihuahua